The production rate of a steel factory is declining due to old machinery. Over the last eight days production has dropped by 1.2 tons. What is the average rate of change in steel production over the eight days? Express the answer in tons per day.
Question
Answer:
Find the unit rate:-1.2 tons
------------- = -0.15 ton/day, or -3/20 ton/day
Β 8 days